CDM Principal Designer
Gradient acted as CDM Advisor to East Sussex Healthcare NHS Trust on the installation of a new fire alarm system at Eastbourne DGH. The upgrade involved replacement detectors, new control panels and electrical rewiring within occupied clinical areas. The hospital remained fully operational, requiring careful coordination with ward managers and estates staff to maintain uninterrupted care and life safety measures during the works.
Gradient prepared the pre-construction information and undertook monthly site audits and walkthroughs, reviewing health and safety documentation, temporary arrangements and permit controls. Inspections focused on temporary works, access and permit controls, and the documentation required to maintain safe operation within a clinical setting. Where risks or non-conformances were identified, these were addressed collaboratively with the contractor and Trust representatives. A Health and Safety File was assembled on completion to support future management and maintenance of the upgraded system.
The project was delivered through structured phasing and clear communication between construction and clinical teams, enabling the upgrade to proceed without interruption to hospital operations. The completed works enhance the site’s fire detection resilience while demonstrating the value of measured and compliant procedures in safety critical environments.