Marine Court
Marine Court Supporting photo
Marine Court Supporting photo
Marine Court Supporting photo

Building Surveyor | Project Management | PD CDM 2015 | Contract Administration

Marine Court, an iconic Grade II listed Art Deco building, required significant roof and structural repairs delivered with care, precision and heritage sensitivity. Our role as Building Surveyors began with a detailed fabric survey to identify defects and inform a clear scope of remedial works. We produced measured surveys, developed CAD drawings of the roof areas, and supported the discharge of Listed Building Consent conditions. Pre-works condition surveys were also completed across communal areas to establish a robust baseline.

Given the building’s coastal setting and complex roofscape, we brought in specialist support where needed, including drone surveys for safe inspection of areas with limited access. Early engagement with residents, engineers, mast operators and specialist contractors ensured programme sequencing, access requirements and resident considerations were factored in from the outset.

The works included roof repairs, structural interventions and carefully coordinated telecom mast relocations, planned to maintain uninterrupted service throughout. Every decision, material choice and repair detail was guided by conservation best practice, protecting the building’s architectural integrity while delivering practical, long-lasting improvements. Regular site attendance and live co-ordination between project partners enabled swift decision making and a shared understanding of quality expectations at every stage.

The completed works deliver robust, heritage sensitive repairs across the external fabric and roof, improving long term resilience and building performance. The project reflects a considered approach to refurbishment, balancing detail, durability and resident confidence in the ongoing care of a complex historic building.